What's New Unreplied Topics Membership About Us Contact Us Privacy Policy
[Ad]

Cooling/Chilling of product

Started by , Today, 12:18 PM
0 Reply
Hi

We are looking at cooking a product to 90 degree C and then chilling the product to less than 5 degrees C. What is the maximum time allowed for the product to cool down? Typically for other products we cool it down in 4 hours however for this product it takes close to 5-6 hours as the product is quite dense (potatoes) . Are they any legal limits / regulations you can share which allows for more than 5 hours to cool the product down? Many thanks in advance
Share this Topic
Topics you might be interested in
Cooling guidelines for Acid Foods Frozen meals - cooling requirements Water Concentration recommended for a cooling bath using Sodium hypochlorite 12.5% For temperature cooling does the time limit of 2-hour start when the temperature is at 135 °F for the sauce? Sauce cooling
[Ad]

Similar Discussion Topics
Cooling guidelines for Acid Foods Frozen meals - cooling requirements Water Concentration recommended for a cooling bath using Sodium hypochlorite 12.5% For temperature cooling does the time limit of 2-hour start when the temperature is at 135 °F for the sauce? Sauce cooling Product cooling (RTE) in an ingredient storage area Allergen segregation during cooling ? Product not reaching the cooling temperature as per the FDA guidance Cooling Product in Small bakery Question Regarding Cooling for NRTE