Jump to content

  • Quick Navigation
Photo

Construction During an Audit

Share this

  • You cannot start a new topic
  • Please log in to reply
3 replies to this topic

Chris347

    Grade - AIFSQN

  • IFSQN Associate
  • 25 posts
  • 1 thanks
2
Neutral

  • United States
    United States

Posted 24 September 2024 - 03:24 PM

Hello, 

 

We have our audit coming up in a couple of weeks and while the audit is going on, we will be in the middle of doing a construction project for a new line that we are adding in. Does anyone have any experience in how to handle an audit during construction? Right now some of the things we have done are; putting up a temporary all that sections off a majority of where the construction is happening from the rest of the warehouse. Since we also have a lot of contractors coming in and out, we have given them red hairnets to wear as a way to identify who is a contractor. Is there something else we should be doing though? Paperwork, risk assessments, management of control, increased swabs, etc?

 

Your guidance is greatly appreciated!

 

Chris 



kconf

    Grade - MIFSQN

  • IFSQN Member
  • 241 posts
  • 28 thanks
40
Excellent

  • Earth
    Earth

Posted 24 September 2024 - 03:36 PM

Hi Chris,

Make sure your GMP is not compromised, and there are no risks to product safety and quality. Contractors should also be adhering to your company's policies. I don't think increased swabs is required at this time unless you notice something. They should be signing in/out though. 

 

As long as you are making all the efforts to not have your products affected by this construction project, you are good! Keep good documentation always. 

 

Good luck! 


  • G M likes this

SQFconsultant

    SQFconsultant

  • IFSQN Fellow
  • 4,869 posts
  • 1175 thanks
1,210
Excellent

  • United States
    United States
  • Gender:Male
  • Interests:Home now on Martha's Vineyard Island/Republic of these United States

Posted 24 September 2024 - 04:21 PM

Oh what fun. Be certain your "approved service providers" docs are up to speed, that all chemicals, paints. Etc are checked and approved, increase inspections for potential drift and ingress egress areas.

 

Make sure all contractors have been trained on your GMP'S as they pertain to contractors.

 

Outside of that have a no stress audit.


All the Best,

 

All Rights Reserved,

Without Prejudice,

Glenn Oster.

 

Glenn Oster Consulting, LLC

-SQF, Internal Auditor Training & eConsultant Retainer

 

Oak Bluffs, Martha's Vineyard Island, Massachussetts

Republic of these United States (restored)
 

www.GCEMVI.XYZ | 774.563.6161 | glenn@glennoster.com
 

 

 

 


Dorothy87

    Grade - SIFSQN

  • IFSQN Senior
  • 252 posts
  • 71 thanks
80
Excellent

  • United Kingdom
    United Kingdom
  • Gender:Female
  • Location:York
  • Interests:Antiques, Art, Sailing

Posted 25 September 2024 - 12:00 PM

hi ;) 

 

from BRC issue 9 

 

4.3.9

 

Temporary structures constructed during building work or refurbishment etc. shall be designed and located to avoid pest harbourage and ensure the safety and quality of products.
 
Risk assessment of temporary activities or structures should be completed prior to their introduction.
 
risk assessment should consider : 
 
- Contractors training (PPE, equipment, site colour coding rules, allergens, CAYG, food defence, site security etc) 
- location (how far from open product)
- dust (air particles) 
- GMP
- Cleaning 
 ;) 
 




Share this


1 user(s) are reading this topic

0 members, 1 guests, 0 anonymous users