How can you determine the overall risk rating in the SSAFE tool’s output sheet, and should a high rating in one area be considered high overall?

Share this

  • You cannot start a new topic
  • Please log in to reply
1 reply to this topic
- - - - -

Alyssa Brigitte

    Grade - Active

  • IFSQN Active
  • 1 posts
  • 0 thanks
0
Neutral

  • Philippines
    Philippines

Posted 29 August 2024 - 07:41 AM

Hi,

 

In the "output sheet" of the SSAFE tool, how can you determine the overall risk rating of opportunities, motivations (own company), motivations (direct suppliers), and motivations (chain/industry) based on the detailed spider?

 

If any one area is marked as "high" in the detailed spider, should the overall risk rating be considered to be high?

 

Thank you for your help.



G M

    Grade - PIFSQN

  • IFSQN Principal
  • 651 posts
  • 126 thanks
200
Excellent

  • United States
    United States
  • Gender:Male

Posted 29 August 2024 - 04:06 PM

As with most things risk-assessment, it will be site specific.  I would address each point on the spider graph similarly to the individual steps in a flow chart of hazard analysis for HACCP.  How you deal with one sub-section could be very different than the methods or justification used at another.