Posted 30 May 2024 - 04:02 PM

We are repurposing an older building for use with a peanut drying and roasting facility. The Raw peanuts are salt-brined, then dried using a continuous dryer in a separate room(Room 1). Once dried, peanuts are conveyed into another room (Room 2)that houses the roaster. Peanuts will be roasted in this room and a thermal kill step will be achieved. My question has to do with whether we can pack out into super sacs our RTE peanuts in the same room that the roaster is located in or do the peanuts need to be conveyed into another room (possible room 3) for bag out and packaging?

 

Currently a process is in place to empty the roaster in raw only bins if the roaster malfunctions (room 2). After the RTE peanuts have been packed into supersacs, they are brought into a shipping room. (room 4). Once complete this facility would be SQF edition 9 module 2&11 audited.



jfrey123

    Grade - PIFSQN

  • IFSQN Principal
  • 758 posts
  • 206 thanks
385
Excellent

  • United States
    United States
  • Gender:Male
  • Location:Sparks, NV

Posted 30 May 2024 - 04:28 PM

I can't see a reason why you cannot package in the same room.  In a perfect dream world, you'd have raw untreated flowing in from one door to immediately be roasted, and the line would end with packaging at the opposite end with a separate door to take to a separate storage area.  But so long as you aren't finding a contamination risk with the final package traveling through a shared area to your finished goods storage, I can't see why it would be completely unacceptable either.  Probably want to designate employees working packaging separate from the employees handling raw and keep them on their own sides of the lines.



Thanked by 1 Member:

SQFconsultant

    SQFconsultant

  • IFSQN Fellow
  • 4,833 posts
  • 1161 thanks
1,192
Excellent

  • United States
    United States
  • Gender:Male
  • Interests:Home now on Martha's Vineyard Island/Republic of these United States

Posted 30 May 2024 - 06:58 PM

I agree with everything Jfrey123 said and add an assumption as we had a peanut roasting facility doing pretty much the same thing - my assumption is that the possibility of malfunction is very low and thus build up of partially roasted peanuts is very low - if however malfunctions are more the norm I'd be looking to see how this could impact (cross-over) the super sack packing area in the same room.

 

So, I'd want to see a build-in on the policy of what might happen if that occurs and how it would be immediately addressed to prevent a cross situation.


All the Best,

 

All Rights Reserved,

Without Prejudice,

Glenn Oster.

 

Glenn Oster Consulting, LLC

Consulting on: SQF Food Safety System Development, Implementation & Certification

eConsultant Retainer | Internal Auditor Training | Corrective Action Avoidance | XRP & XLM

 

Vineyard Haven, Martha's Vineyard Island, Massachussetts

Republic of these United States (restored)
 

www.GlennOster.com | 774.563.6161 | glenn@glennoster.com
 

 

 

 


Thanked by 1 Member:


Share this

1 user(s) are reading this topic

0 members, 1 guests, 0 anonymous users