- The site shall have in place an environmental monitoring programme whose design is based on risk. The programme shall include procedures and documentation that capture the following: 1. sampling protocol, 2. identification of sample locations, 3. frequency of sampling, 4. target organisms, 5. test methods, 6. control limits, 7. a record of results 8. and result evaluation.
Action: Please ensure that the testing plan incorporates a comprehensive risk assessment to determine the sampling size, similarly to what was already done regarding the location, severity, and associated risk factors.
Can someone help me?