What's New Unreplied Topics Membership About Us Contact Us Privacy Policy
[Ad]

Risk Assessment on forklift traveling outside

Started by , Dec 16 2023 06:06 PM
3 Replies

Hello can anybody guide me I'm new doing risk assessments , 

I need to do one for forklift we have a building across   the parking lot we move boxes and finished product all ready pack and in boxes.

 

 

Thank you .

Share this Topic
Topics you might be interested in
Storage and separation risk assessment Supplier Approval Criteria for Low-Risk Services Risk assessment of service providers How to Develop a Cleaning Schedule Based on Risk Assessment? What are some effective scoring methods and control measures for a raw material risk assessment in a food manufacturing facility?
[Ad]

Hard to assess without further info :)

 

Can't go wrong with the likelihood x severity = risk significance model

 

Some hazards to consider are:

- microbial contamination from external environment to product

- if chilled/frozen, transfer time - risk of pathogen growth if left outside e.g. waiting for space to be made

- foreign body contamination from external environment to product incl pest contamination

- threat to product from doors being left open during transfer time

 

 

Considering:

- is stock fully sealed

- do you conduct any swabbing of FLT and area? historical results?

- FP results

- startup checks of FLT 

1 Like

Thank you Alex 

Following ☺️☺️

Similar Discussion Topics
Storage and separation risk assessment Supplier Approval Criteria for Low-Risk Services Risk assessment of service providers How to Develop a Cleaning Schedule Based on Risk Assessment? What are some effective scoring methods and control measures for a raw material risk assessment in a food manufacturing facility? How can you determine the overall risk rating in the SSAFE tool’s output sheet, and should a high rating in one area be considered high overall? Are LED high bay lights suitable for use in plastic manufacturing facilities, and what factors should be considered in a risk assessment? Legionella Risk Assessment in Water System High risk supplier approval FSSC 22000 V6 Risk-based change management process