Risk matrix

Started by , Jul 29 2021 01:00 PM
1 Reply

Hello, please can someone helps me to understand this formula: =SI(D4=Lists!$I$2;"1.0";SI($D4="";"";MOYENNE(RECHERCHEV($D4;Lists!$I$1:$Q$6;9;0);(RECHERCHEV($E4;Lists!$J$1:$Q$6;8;0)))))

 

Please see attached

Share this Topic
Topics you might be interested in
What are some effective scoring methods and control measures for a raw material risk assessment in a food manufacturing facility? How can you determine the overall risk rating in the SSAFE tool’s output sheet, and should a high rating in one area be considered high overall? Are LED high bay lights suitable for use in plastic manufacturing facilities, and what factors should be considered in a risk assessment? Legionella Risk Assessment in Water System High risk supplier approval
[Ad]

I don't see an attachment. It looks like its in French.

 

=IF(D4=Lists!$I$2;"1.0";IF($D4="";"";AVERAGE(VLOOKUP($D4;Lists!$I$1:$Q$6;9;0);(VLOOKUP($E4;Lists!$J$1:$Q$6;8;0)))))

 

Above is translated. Lemme try to interpret it. I assume french syntax is the same as english.

 

---

 

If D4 is I2, then its 1 (not sure why this is a text string)

if D4 is NOT I2, then proceed

if D4 is blank, this cell is blank (typically used to prevent ugly errors in cells)

if D4 is NOT blank, then proceed

We need an average of two values, and to do that we need to look them up

 

First lookup

find D4 in the range I1:Q9, then return the result in column 9 in that row

 

Second lookup

Find E4 in the range J1:Q6, then return the result in column 9 in that row

 

Once those two lookups are returned, it takes an average of those values

 

---

 

So basically, If D4 is I2, then its one, if its not and its blank then its blank, if its not blank, and its not I2, then find two numbers in the same row as D4 in another table and average them together.

 

That's the best I can do not having seen the spreadsheet.


Similar Discussion Topics
What are some effective scoring methods and control measures for a raw material risk assessment in a food manufacturing facility? How can you determine the overall risk rating in the SSAFE tool’s output sheet, and should a high rating in one area be considered high overall? Are LED high bay lights suitable for use in plastic manufacturing facilities, and what factors should be considered in a risk assessment? Legionella Risk Assessment in Water System High risk supplier approval FSSC 22000 V6 Risk-based change management process Risk Analysis for EMP program Ozone Transfer Chamber Low Risk to High Care/Risk In a low risk facility are employees required to change when using restrooms? Incorporating Outsourced Suppliers into HACCP Risk Assessments: BRC Clause 3.5.4.3 Compliance