SQF 11.1.1.1 Site Assessment
Started by cicimari, May 25 2021 03:53 PM
What should be included on my assessment of local activities and site environment? Does anyone have an example? I started with a description of our facility and adjacent buildings/businesses and am trying to think of potential hazards and risks. I am probably overthinking this.
Cleaning frquency risk assessment
What are some effective scoring methods and control measures for a raw material risk assessment in a food manufacturing facility?
Are LED high bay lights suitable for use in plastic manufacturing facilities, and what factors should be considered in a risk assessment?
Legionella Risk Assessment in Water System
False Positive in Micro Assessment
[Ad]
You are looking at the property (site map) from the standpoint of external risks ( your bordering neighbors properties and buildings) and how thos extetnals impact your propertyvand buildings, possibly extending to safety, product, personnel etc.
You do wantbto get a schematic site map, basically an overhead view of your site.
If you don't have one handy you should contact your towns government they should havecone in theire map/lot/plat books.
It will showxeasments, overhead lines, bordering properties, water, gas and cable cross lines, sewer lines, wells, etc.
From that you wouls run your risk or non risk reviews.
We recemtly looked at one where an active gas line was "found" running only 6 inches down in the ground right at the fence line area... a definite risk to entire area.
You do wantbto get a schematic site map, basically an overhead view of your site.
If you don't have one handy you should contact your towns government they should havecone in theire map/lot/plat books.
It will showxeasments, overhead lines, bordering properties, water, gas and cable cross lines, sewer lines, wells, etc.
From that you wouls run your risk or non risk reviews.
We recemtly looked at one where an active gas line was "found" running only 6 inches down in the ground right at the fence line area... a definite risk to entire area.
2 Likes2 Thanks
Cleaning frquency risk assessment
What are some effective scoring methods and control measures for a raw material risk assessment in a food manufacturing facility?
Are LED high bay lights suitable for use in plastic manufacturing facilities, and what factors should be considered in a risk assessment?
Legionella Risk Assessment in Water System
False Positive in Micro Assessment
Risk Assessment for Protective Clothing in High Care Areas: Key Hazards and Considerations
Food Fraud Assessment
Pre-Assessment vs Initial Audit
Green Coffee Suppliers Assessment
Site Location and Premises