Hi Djammur,

Whats the purpose of reminder slitting blades, is this question related to food processing?

 

Kind regards

Inam

5 Replies

Does anyone have an example of how to control rewinder slitting blades?

Share this Topic
Topics you might be interested in
Allergen Labeling_Portion Control Packages @ Salad Bar Seeking Advice and Resources for Conducting Shelf Life Studies in Seafood Quality Control What are the recommended CCP'S for hazard control on bone-in vs. boneless chicken in a small restaurant? Document Control and Consolidating Documents Chilling & Freezing Time and Temperature Control... Legislation?
[Ad]

Hi Djammur,

Whats the purpose of reminder slitting blades, is this question related to food processing?

 

Kind regards

Inam

1 Thank

they are used in flexographic printing.  Food packaging.  The slitter blades slit the rolls of labels or film from many rows of labels into individual rolls of 1 label

We buy blades packed in plastic boxes. After receiving, we label every blade tray in a box with a number and prepare a replacement log sheet for that box. Each time the splitting team change a blade, they take a new one from the box, stick the old one on the log sheet and record the replacement & condition of the blade (ex.: all broken pieces are collected).

Also, a maintenance team check the stocking of blades and log sheets every week.

1 Thank

To work out a practical control method, you would need to know how many slitters are involved, how many blades you use in a day (or shift), who issues them and are they all the same type, eg the razor type or scalpel type etc.

 

Making a control method too complicated invariably means that it is not followed and mistakes happen.

1 Thank

We issue each machine operator two blades at the beginning of their shift.   This is documented on the pre-op sheet.  They turn in the blades at the end of the day which is also verified on the pre-op.  If they need another blade throughout the day then they must turn in all of the pieces of the blade they are replacing.

1 Thank

Similar Discussion Topics
Allergen Labeling_Portion Control Packages @ Salad Bar Seeking Advice and Resources for Conducting Shelf Life Studies in Seafood Quality Control What are the recommended CCP'S for hazard control on bone-in vs. boneless chicken in a small restaurant? Document Control and Consolidating Documents Chilling & Freezing Time and Temperature Control... Legislation? Pest control in pharmaceutical warehouse Preventive control forms Is it possible to have no OPRP if we can control through PRPs? BRCGS 5.4.1 Process control Document Control