What's New Unreplied Topics Membership About Us Contact Us Privacy Policy
[Ad]

2.1.2 Management Responsibility, policy requirements

Started by , Dec 08 2018 07:45 AM
4 Replies

I need help, again.
I need to make a policy for each of the points in section 2.1.2 of the SQF standards (Management Responsibility). For example, a policy for 2.1.2.1, another policy for 2.1.2.2, then another policy for 2.1.2.3 and so on. Or it is a single policy for the entire section (2.1.2 Management Responsibility).

I sent an attachment with section 2.1.2 for reference.

 

Thanks in advance for your help.2.docx   14.76KB   187 downloads

Share this Topic
Topics you might be interested in
FSSC 22000 V6 Risk-based change management process Micro Testing requirements Food Safety Requirements Food Safety Requirements Can Inhalers and Emergency Prescribed Medications be Allowed in Food Production Areas under SQF and FDA Requirements?
[Ad]

No, you do not need a policy for each bullet points.
 
I have a Management Commitment and Review Procedure (or Policy, however you want to name it). It lists the SQF requirements for management commitment under 2.1.2. Basically rewording what is included in this section into my procedure (such as 2.1.2.1, 2.1.2.2, etc).
 
2.1.2.1 -  An org chart detailing the reporting structure will satisfy this.

 

Attached Files

3 Likes3 Thanks
Thank you very much.

I added a File system to keep them straight (shown in the attached screen shot)SQF FIle Screenshot.jpg   62.56KB   0 downloads but you could just keep them all in one folder, it's just easier to find them if you know the number of the Policy / Procedure you're looking for.

Single blanket coverage document.


Similar Discussion Topics
FSSC 22000 V6 Risk-based change management process Micro Testing requirements Food Safety Requirements Food Safety Requirements Can Inhalers and Emergency Prescribed Medications be Allowed in Food Production Areas under SQF and FDA Requirements? Documentation Requirements for BRCGS Non-Conformance Summary Costco Food Safety Supplier Requirements New Consultation Opens for GFSI Benchmarking Requirements v2024 Testing Weight Requirements for Composite Samples: Should We Consult the Customer? Chocolate Melting Kettles - Holding temperature & cleaning requirements