Do Tesco lock specs on TTL before a PIU ?
HI,
We are due our PIU and I've been told specs get locked on TTL before they arrive. Anyone confirm this ?
Cheers
I am not familiar with their protocols/procedures.
My apologies for not being able to help assist in this manner.
I am not familiar with their protocols/procedures.
My apologies for not being able to help assist in this manner.
Hi Belmont,
No problem. Thanks for yr other inputs.
Personally i have no idea what PIU or TTL stand for.
Andy Hi,
The specs. should be locked, if they are not, they have not been authorised by the Tesco Technical Manager and you will be given a NC by the PIU auditor. However, if you have asked the TTM to authorised i.e. approve the spec they will get a NC.
Charles
PIU Product Integrity Unit
TTL Tesco Technical Library
Kind regards
Chris
.
Andy Hi,
The specs. should be locked, if they are not, they have not been authorised by the Tesco Technical Manager and you will be given a NC by the PIU auditor. However, if you have asked the TTM to authorised i.e. approve the spec they will get a NC.
Charles
PIU Product Integrity Unit
TTL Tesco Technical Library
Kind regards
Chris
.
Hi Chris,
Thank you, i should have remembered -
http://www.ifsqn.com...ge-2#entry31222
Sounds like George Orwell's 1984 = Tescospeak. I deduce "locked" means posted.