Hi,

does anybody can help me with those.

• Procedures for temporary repairs
• Procedures for emergency repairs

what exactly should such procedure contain?

Share this Topic
Topics you might be interested in
Creating an Accidental Contamination Procedure: Need Guidance Transport Truck Seal Verification Procedure and Record How should a near-miss procedure be established and implemented, and are there any examples available for guidance? Can you provide a template or example of a food loss and waste policy procedure for a semi-refined carrageenan company? Labels and Labelling Procedure
[Ad]

Dear B. Nowak,

 

Such procedure should include:

- hygiene rules for engineers, to prevent contamination;

- release by production/ documented hygiene clearance procedure, which records that product contamination hazards have been removed from machinery and equipment;

- the materials that can be used when there is possible contact with food;

- time scale to realise permanent repair;

- control measures to check that the temporary repair is not a food contamination risk;

- the failures that might be fixed with temporary repairs.

 

Probably, some one else, can complete this list.

1 Thank

This thread may help: Temporary Engineering

 

Regards,

Simon

This thread may help: Temporary Engineering

 

Regards,

Simon

IT HELPED:)

 

Thank you. 

 

Regards,


Similar Discussion Topics
Creating an Accidental Contamination Procedure: Need Guidance Transport Truck Seal Verification Procedure and Record How should a near-miss procedure be established and implemented, and are there any examples available for guidance? Can you provide a template or example of a food loss and waste policy procedure for a semi-refined carrageenan company? Labels and Labelling Procedure Is a Written Procedure Required for Existing Products According to BRCGS Clause 5.1.1? Procedure for Load and Unload Changeover procedure for transition of FSSC22000 V5.1 to V6 Standard Operating Procedure vs Work Instruction Need to implement a manual cleaning procedure while our rack washer is down